This browser is too old to run Achievable.

Update it, or open this page in a current version of Chrome, Safari, Firefox or Edge. On an iPhone or iPad, update iOS: every browser there runs on the version of Safari that comes with it.

Achievable logoAchievable logo
CMA Part 1
Sign in
Sign up
Purchase
Textbook
Practice exams
Support
How it works
Resources
Exam catalog
Mountain with a flag at the peak
Textbook
Introduction
1. External financial reporting decisions
2. Planning, budgeting, and forecasting
3. Performance management
4. Cost management
5. Internal control
5.1 Governance, risk and compliance
5.2 System controls and security measures
5.2.1 General accounting system controls
5.2.2 System development controls
5.2.3 Application and transaction controls
5.2.4 Technology controls
5.2.5 Backup controls and business continuity planning
6. Technology and analytics
Wrapping up
Achievable logoAchievable logo
5.2.5 Backup controls and business continuity planning
Achievable CMA Part 1
5. Internal control
5.2. System controls and security measures
Our CMA Part 1 course is currently in development and is a work-in-progress.

Backup controls and business continuity planning

6 min read
Font
Discuss
Share
Feedback

Learning outcome statements

The learning outcome statements relevant for this section are:

  1. identify and describe the types of storage controls and demonstrate an understanding of when and why they are used
  2. explain the importance of backing up all program and data files regularly, and storing the backups at a secure remote site
  3. define business continuity planning
  4. define the objective of a disaster recovery plan and identify the components of such a plan including hot, warm, and cold sites

Backup controls

Definitions
Backup controls
Policies and procedures designed to ensure that critical data and system programs are preserved and can be restored in the event of data loss, corruption, or system failure.

Backups provide a crucial safeguard against data loss due to hardware failure, cyberattacks, natural disasters, or human error.

To enhance their effectiveness, backup processes must be supported by robust controls, including:

  • Access controls: Restrict who can create, modify, or delete backup data.
  • Encryption: Encrypt backup files to protect data confidentiality during storage and transmission.
  • Regular testing: Periodically test backup restorations to verify data integrity and the effectiveness of recovery procedures.
  • Automated scheduling: Use automated systems to ensure backups occur regularly and consistently without manual intervention.
  • Backup logs and audit trails: Maintain records of all backup activity for monitoring and compliance.
  • Physical security: Protect onsite and offsite backup media from theft, damage, or unauthorized access through locked storage, surveillance, and environmental controls.

Importance of backup controls

  • Regularly backing up program and data files is essential for maintaining operational continuity and preventing significant disruptions.
  • Storing backups at a secure remote site, either physically offsite or through cloud-based solutions, protects against localized threats such as fires, floods, or physical theft.
  • Backups help organizations meet regulatory and compliance requirements related to data retention and disaster recovery planning.

Common backup methods

  1. Full backups: Capture all data and system files at a given point in time. This method is comprehensive but requires more storage space and time.
  2. Incremental backups: Only back up data that has changed since the last backup, saving time and storage but requiring more effort during restoration.
  3. Differential backups: Back up data changed since the last full backup, offering a balance between speed and comprehensiveness.
  4. Cloud backups: Store backup data on cloud platforms, offering accessibility, scalability, and often geographic redundancy.
  5. Disk and tape backups: Store data on physical media, which can be archived offsite for long-term retention and disaster recovery.
  6. Real-time replication: Continuously mirror data from a primary system to a backup system, allowing for minimal downtime in high-availability environments.

Example: Restoring after a Thursday failure

A system runs a full backup every Sunday, plus daily backups the rest of the week. If the system fails on Thursday:

  • With incremental backups, you restore Sunday’s full backup, then apply each incremental backup in order: Monday, Tuesday, and Wednesday.
  • With differential backups, you restore Sunday’s full backup, then apply only Wednesday’s differential backup, since it already contains all the changes made since Sunday.

Establishing a formal backup policy is essential to ensure that backup controls are reliable and effective when needed.

Business continuity planning

Definitions
Business continuity planning (BCP)
The strategic and operational framework that organizations use to prepare for, respond to, and recover from disruptive events, such as natural disasters, cyberattacks, system failures, or pandemics.

The goal of BCP is to ensure that critical business functions can continue or be restored promptly with minimal disruption.

Disaster recovery plan (DRP) is a key component of business continuity. Its primary objective is to restore IT systems, data, and infrastructure after an outage or disaster. A well-designed DRP includes clearly defined recovery procedures, assigned responsibilities, communication plans, and documentation of recovery time objectives (RTOs) and recovery point objectives (RPOs). RTO is the maximum acceptable downtime before a system must be restored, and RPO is the maximum acceptable amount of data loss, measured as the time since the last usable backup. A low RTO or RPO tolerance pushes an organization toward a hot site and frequent backups, while a longer tolerance allows for a warm or cold site with less frequent backups.

Key components of a disaster recovery plan

  • Inventory of critical systems, applications, and data
  • Designated recovery personnel and their contact details
  • Emergency communication procedures
  • Step-by-step recovery procedures for each system
  • Regular testing and updating of the plan

Types of recovery sites

Organizations often prepare secondary locations, known as recovery sites, where operations can be temporarily resumed in the event of a disaster. These sites vary in readiness and cost:

Types of back-up sites
Types of back-up sites
Achievable

Each type of site has trade-offs between cost and recovery speed. Organizations choose based on their risk tolerance, business impact analysis, and available resources.

1. Hot site

A hot site is a fully operational and fully equipped facility that mirrors the original production environment, including hardware, software, and real-time or near real-time data replication. In the event of a disaster, business operations can be switched over to a hot site almost immediately with minimal interruption.

This type of site is ideal for organizations with very low tolerance for downtime or data loss. However, the comprehensive infrastructure and continuous data synchronization involved make hot sites the most expensive option among disaster recovery alternatives.

2. Warm site

A warm site is a recovery facility that includes some pre-installed hardware and network connectivity, but it is not fully operational until additional setup is completed. Unlike a hot site, a warm site does not receive continuously synchronized data; it relies on periodic backups or replication instead. This means that during a disaster, organizations must first update or restore current data before resuming operations.

Warm sites offer a middle ground between cost and recovery time, making them a viable option for companies that need to recover within hours or days but do not require immediate failover capabilities.

3. Cold site

A cold site is a bare-bones facility with power, internet access, and physical space, but no installed IT infrastructure or live data. In the event of a disaster, the organization must deliver and install hardware, set up systems, and restore data from backups. This results in the longest recovery time among the three site types.

Cold sites are appropriate for non-critical operations or as part of a layered recovery strategy where full redundancy is not required.

Example: Choosing a recovery site

A financial institution that must resume customer transactions without delay maintains a hot site for near-instant failover. A regional office that can tolerate a short delay uses a warm site, restoring the latest backup data before resuming work. A small business with minimal uptime requirements uses a cold site, accepting a longer recovery time in exchange for lower cost.

Backup controls

  • Policies/procedures ensuring critical data and programs can be restored after loss, corruption, or failure
  • Key supporting controls: access restrictions, encryption, regular restoration testing, automated scheduling, audit logs, physical security
  • Regular backups + secure remote/offsite (or cloud) storage protect against localized disasters and support regulatory compliance

Backup methods

  • Full: complete copy each time; most storage/time but simplest restore
  • Incremental: only changes since last backup (full or incremental); fast to create, restoration requires applying all increments in order
  • Differential: changes since last full backup; restoration only needs full backup + latest differential
  • Cloud, disk/tape, real-time replication: offer scalability, offsite archiving, or near-zero downtime via continuous mirroring

Business continuity & disaster recovery planning

  • BCP: overall framework to prepare for, respond to, and recover from disruptive events, keeping critical functions running
  • DRP: subset of BCP focused on restoring IT systems/data/infrastructure
  • Key DRP metrics:
    • RTO (Recovery Time Objective): max acceptable downtime
    • RPO (Recovery Point Objective): max acceptable data loss (time since last good backup)
    • Lower RTO/RPO tolerance → need hot site & frequent backups; higher tolerance → warm/cold site sufficient
  • DRP components: inventory of critical systems/data, recovery personnel & contacts, communication procedures, step-by-step recovery steps, regular testing/updates

Recovery site types

  • Hot site: fully operational, real-time data replication, near-immediate failover; highest cost, lowest downtime tolerance use case
  • Warm site: partially equipped, periodic (not continuous) data sync; moderate cost/recovery time (hours-days)
  • Cold site: bare facility (power/space/internet only), no pre-installed systems/data; cheapest but longest recovery time
  • Choice depends on organization’s risk tolerance, cost constraints, and business impact analysis

Sign up for free to take 24 quiz questions on this topic

Previous
Next  | 6.1.1 Accounting information systems
All rights reserved ©2016 - 2026 Achievable, Inc.

Backup controls and business continuity planning

Learning outcome statements

The learning outcome statements relevant for this section are:

  1. identify and describe the types of storage controls and demonstrate an understanding of when and why they are used
  2. explain the importance of backing up all program and data files regularly, and storing the backups at a secure remote site
  3. define business continuity planning
  4. define the objective of a disaster recovery plan and identify the components of such a plan including hot, warm, and cold sites

Backup controls

Definitions
Backup controls
Policies and procedures designed to ensure that critical data and system programs are preserved and can be restored in the event of data loss, corruption, or system failure.

Backups provide a crucial safeguard against data loss due to hardware failure, cyberattacks, natural disasters, or human error.

To enhance their effectiveness, backup processes must be supported by robust controls, including:

  • Access controls: Restrict who can create, modify, or delete backup data.
  • Encryption: Encrypt backup files to protect data confidentiality during storage and transmission.
  • Regular testing: Periodically test backup restorations to verify data integrity and the effectiveness of recovery procedures.
  • Automated scheduling: Use automated systems to ensure backups occur regularly and consistently without manual intervention.
  • Backup logs and audit trails: Maintain records of all backup activity for monitoring and compliance.
  • Physical security: Protect onsite and offsite backup media from theft, damage, or unauthorized access through locked storage, surveillance, and environmental controls.

Importance of backup controls

  • Regularly backing up program and data files is essential for maintaining operational continuity and preventing significant disruptions.
  • Storing backups at a secure remote site, either physically offsite or through cloud-based solutions, protects against localized threats such as fires, floods, or physical theft.
  • Backups help organizations meet regulatory and compliance requirements related to data retention and disaster recovery planning.

Common backup methods

  1. Full backups: Capture all data and system files at a given point in time. This method is comprehensive but requires more storage space and time.
  2. Incremental backups: Only back up data that has changed since the last backup, saving time and storage but requiring more effort during restoration.
  3. Differential backups: Back up data changed since the last full backup, offering a balance between speed and comprehensiveness.
  4. Cloud backups: Store backup data on cloud platforms, offering accessibility, scalability, and often geographic redundancy.
  5. Disk and tape backups: Store data on physical media, which can be archived offsite for long-term retention and disaster recovery.
  6. Real-time replication: Continuously mirror data from a primary system to a backup system, allowing for minimal downtime in high-availability environments.

Example: Restoring after a Thursday failure

A system runs a full backup every Sunday, plus daily backups the rest of the week. If the system fails on Thursday:

  • With incremental backups, you restore Sunday’s full backup, then apply each incremental backup in order: Monday, Tuesday, and Wednesday.
  • With differential backups, you restore Sunday’s full backup, then apply only Wednesday’s differential backup, since it already contains all the changes made since Sunday.

Establishing a formal backup policy is essential to ensure that backup controls are reliable and effective when needed.

Business continuity planning

Definitions
Business continuity planning (BCP)
The strategic and operational framework that organizations use to prepare for, respond to, and recover from disruptive events, such as natural disasters, cyberattacks, system failures, or pandemics.

The goal of BCP is to ensure that critical business functions can continue or be restored promptly with minimal disruption.

Disaster recovery plan (DRP) is a key component of business continuity. Its primary objective is to restore IT systems, data, and infrastructure after an outage or disaster. A well-designed DRP includes clearly defined recovery procedures, assigned responsibilities, communication plans, and documentation of recovery time objectives (RTOs) and recovery point objectives (RPOs). RTO is the maximum acceptable downtime before a system must be restored, and RPO is the maximum acceptable amount of data loss, measured as the time since the last usable backup. A low RTO or RPO tolerance pushes an organization toward a hot site and frequent backups, while a longer tolerance allows for a warm or cold site with less frequent backups.

Key components of a disaster recovery plan

  • Inventory of critical systems, applications, and data
  • Designated recovery personnel and their contact details
  • Emergency communication procedures
  • Step-by-step recovery procedures for each system
  • Regular testing and updating of the plan

Types of recovery sites

Organizations often prepare secondary locations, known as recovery sites, where operations can be temporarily resumed in the event of a disaster. These sites vary in readiness and cost:

Each type of site has trade-offs between cost and recovery speed. Organizations choose based on their risk tolerance, business impact analysis, and available resources.

1. Hot site

A hot site is a fully operational and fully equipped facility that mirrors the original production environment, including hardware, software, and real-time or near real-time data replication. In the event of a disaster, business operations can be switched over to a hot site almost immediately with minimal interruption.

This type of site is ideal for organizations with very low tolerance for downtime or data loss. However, the comprehensive infrastructure and continuous data synchronization involved make hot sites the most expensive option among disaster recovery alternatives.

2. Warm site

A warm site is a recovery facility that includes some pre-installed hardware and network connectivity, but it is not fully operational until additional setup is completed. Unlike a hot site, a warm site does not receive continuously synchronized data; it relies on periodic backups or replication instead. This means that during a disaster, organizations must first update or restore current data before resuming operations.

Warm sites offer a middle ground between cost and recovery time, making them a viable option for companies that need to recover within hours or days but do not require immediate failover capabilities.

3. Cold site

A cold site is a bare-bones facility with power, internet access, and physical space, but no installed IT infrastructure or live data. In the event of a disaster, the organization must deliver and install hardware, set up systems, and restore data from backups. This results in the longest recovery time among the three site types.

Cold sites are appropriate for non-critical operations or as part of a layered recovery strategy where full redundancy is not required.

Example: Choosing a recovery site

A financial institution that must resume customer transactions without delay maintains a hot site for near-instant failover. A regional office that can tolerate a short delay uses a warm site, restoring the latest backup data before resuming work. A small business with minimal uptime requirements uses a cold site, accepting a longer recovery time in exchange for lower cost.

Key points

Backup controls

  • Policies/procedures ensuring critical data and programs can be restored after loss, corruption, or failure
  • Key supporting controls: access restrictions, encryption, regular restoration testing, automated scheduling, audit logs, physical security
  • Regular backups + secure remote/offsite (or cloud) storage protect against localized disasters and support regulatory compliance

Backup methods

  • Full: complete copy each time; most storage/time but simplest restore
  • Incremental: only changes since last backup (full or incremental); fast to create, restoration requires applying all increments in order
  • Differential: changes since last full backup; restoration only needs full backup + latest differential
  • Cloud, disk/tape, real-time replication: offer scalability, offsite archiving, or near-zero downtime via continuous mirroring

Business continuity & disaster recovery planning

  • BCP: overall framework to prepare for, respond to, and recover from disruptive events, keeping critical functions running
  • DRP: subset of BCP focused on restoring IT systems/data/infrastructure
  • Key DRP metrics:
    • RTO (Recovery Time Objective): max acceptable downtime
    • RPO (Recovery Point Objective): max acceptable data loss (time since last good backup)
    • Lower RTO/RPO tolerance → need hot site & frequent backups; higher tolerance → warm/cold site sufficient
  • DRP components: inventory of critical systems/data, recovery personnel & contacts, communication procedures, step-by-step recovery steps, regular testing/updates

Recovery site types

  • Hot site: fully operational, real-time data replication, near-immediate failover; highest cost, lowest downtime tolerance use case
  • Warm site: partially equipped, periodic (not continuous) data sync; moderate cost/recovery time (hours-days)
  • Cold site: bare facility (power/space/internet only), no pre-installed systems/data; cheapest but longest recovery time
  • Choice depends on organization’s risk tolerance, cost constraints, and business impact analysis

More from System controls and security measures

  • General accounting system controls
  • System development controls
  • Application and transaction controls
  • Technology controls